Connecting a new 100MW data center to the US grid costs up to $500 million in interconnection fees before a single server is installed. That cost gets recovered through your storage bill. Filecoin already exists at exabyte scale. The capacity is live. https://t.co/UWSwe6dYWY
@Filecoin·2026년 6월 3일
기사 읽기관련 프로젝트
