QooryBeta
Jordan Hatcher

Jordan Hatcher

Co-Founder & CLO/COO em The Grid

Jordan Hatcher é co-fundador e COO da The Grid. Ele é formado pela University of Texas Law School e pela University of Edinburgh.

Menções em notícias

India’s largest power producer NTPC s looking to bring back low-tech, polluting coal generators able to run at low capacity, to accommodate more renewables in the grid https://t.co/16QZF5ZHHA

@businessjun. de 2026

AI Infrastructure's Next Bottleneck: Networking and Power Constraints

@Melt_Demjun. de 2026

High school classmate joined SpaceX in 2015. Just tried to message him to say congrats and he disappeared. No Facebook, no instagram, no LinkedIn. All deleted. Probably worth $100M+ and went completely off the grid

@bfavierojun. de 2026

Grid Mining: Motherlode Every round has a 1/625 shot at the motherlode. The pool grows by 0.2 ORE each round until it hits. Only 4 have ever paid 600+ ORE. Yesterday's motherlode landed at 602.4 ORE, ending a 3,012-round dry spell lasting 60+ hours without a hit. 414 miners were on the grid when t

@OREsupplyjun. de 2026

IEA projects global data center electricity consumption will exceed 1,000 TWh by 2030, more than Japan's entire annual consumption. The grid was not built for this load. Filecoin providers follow the electrons, not the grid map. The capacity already exists where the power is. https://t.co/Dym17E

@Filecoinjun. de 2026

Kickoff. If you haven’t placed a trade yet, you’ve still got about 40 minutes. The grid doesn’t lock until halftime 👇 https://t.co/qWa5pPfkOg

@42spacemai. de 2026

When The Grid Dies: How A Single Blackout Could Unravel A Modern World https://t.co/dV064glX1i

@zerohedgemai. de 2026

Helmed by billionaire Michael Dell’s son, Base Power is manufacturing its own home batteries to provide back up electricity in regions where the grid fails to serve people reliably. Learn more ⬇️ https://t.co/OaQEki72aI

@Forbesmai. de 2026

The GRID token will have utility that will be announced in the coming days...stay tuned

@iowitzmai. de 2026

Transformer prices are up 80% over five years. Lead times stretch to 210 weeks for specialized equipment. The bottleneck is physics and supply chain. Filecoin network bypasses both. Providers deploy wherever electrons are cheap, not wherever the grid queue is shortest. https://t.co/4NbfofJ4B7

@Filecoinmai. de 2026